2013
Parking Deck take with the glide cam on the move.
drummers drumming, day two.
playing in place for a moment.
video crew and a “crazy” jump artist look on during the competition take.
every section displayed crazy tricks throughout the routine
designer/performer tosses at the start of the routine, day two.
a jumper leaps over a performer
quad drummers crossing over, day two take.
fully extended sticks, body positions. day two.
the drummers had detailed the whole routine in one day. from day two.
our extreme jumper tumbles in mid-air
iphone image magic. warming up, second morning.
starting position for the routine. day two take.
after a split-sequential roll down the snare line, the ends toss a stick!
tired from a long day, the drummers had fun together pushing thru reps
the troupe gets through the two-minute routine
practice runs on saturday night
rehearsal before statue takes, day two.
tagging the first rep of the second day.
high-stepping bass during a hot afternoon rehearsal, day one.
third movement of the routine
shooting on top of a parking deck. from the side, morning two.
we began getting footage saturday night
dance company pose as the drumline plays a jungle jingle.